Military industrial organizations / Czechoslovakia / CKD-Plzen
CKD-Plzen
Czechoslovakia's military industrial organization for train, railway artillery, support equipment. Click a trait on the screen for its bonuses.

Design Team and Industrial Manufacturer for
Train
Railway Artillery
Support Equipment
Research bonus: 5%
Initial Trait: Train Manufacturer
- Production Cost -5%
- Production efficiency cap +5%
- Research Bonus +10%
| ID | CZE_CKD_plzen_organization |
|---|---|
| Countries | |
| Traits | 18 |
| Tree | the game builds it on generic_train_organization |
Design and Production
Support
Weapons
Material Improvements
Only for Train:
When assigned to a production line:
- Production efficiency cap +5%
Joint Stock Schemes
Only for Train:
When assigned to a production line:
- Production efficiency gain +2%
- Funds Gain +20%
Rapid Production Upscaling
Only for Train:
When assigned to a production line:
- Production efficiency gain +3%
- Funds Gain +5%
- Requirement for Size Up -25%
Needs Joint Stock Schemes
Additional Flak Wagons
Only for Train:
When assigned to an equipment variant:
- Air Attack +10%
Improved Axle Fitting
Only for Train, Railway Artillery:
When assigned to a production line:
- Production efficiency gain +5%
- Production resource penalty -5%
Needs one of Material Improvements, Joint Stock Schemes
Improved Wagon Design
Only for Support Equipment:
When assigned to an equipment variant:
- Reliability +2%
When assigned to a production line:
- Production output cost -3%
Needs Improved Axle Fitting
Improved Loading Methods
Only for Support Equipment:
When assigned to a production line:
- Production efficiency gain +3%
Needs Improved Wagon Design
Minimalist Wagon Design
Only for Support Equipment:
When assigned to a production line:
- Production resource need -5%
- Production resource penalty -1%
Needs Improved Loading Methods
Ugly Ducklings
Only for Train:
When assigned to a production line:
- Production output cost -5%
- Production resource penalty -5%
Needs Improved Axle Fitting
Can't be taken with Armor Plating
Armor Plating
Only for Train:
When assigned to an equipment variant:
- Armor +10%
When assigned to a production line:
- Production resource penalty +10%
Needs Improved Axle Fitting
Can't be taken with Ugly Ducklings
Simplified Rail Carrier
Only for Railway Gun:
When assigned to a production line:
- Production output +10%
Needs Improved Axle Fitting
Improved Barrel Lining
Only for Railway Gun:
When assigned to an equipment variant:
- Reliability +10%
Needs Simplified Rail Carrier
Quick Design Turnarounds
Only for Train:
When assigned to a production line:
- Production efficiency gain +5%
- Design Team Assign Cost -100%
- Design Team Change Cost -100%
Needs one of Armor Plating, Ugly Ducklings
Salvage Destroyed Locomotives
Only for Train:
When assigned to a production line:
- Production resource need -25%
Needs Quick Design Turnarounds
Production at Scale
Only for Train:
When assigned to a production line:
- Production output +5%
Needs Quick Design Turnarounds
Machine Assembly
Only for Train:
When assigned to a production line:
- Production efficiency cap +5%
Needs Quick Design Turnarounds
Expanded Production Facilities
Train, Railway Artillery, Support Equipment:
When assigned to a production line:
- Production output cost -5%
- Production output +5%
Needs Joint Stock Schemes
Shown when
Czechoslovak Republic: - Original country is
Czechoslovak Republic
- Original country is
Can be taken when
Czechoslovak Republic: - Has completed focus CKD's Secondary Facilities
Bat'a Corporation Facilities
Train, Railway Artillery, Support Equipment:
When assigned to a production line:
- Production resource penalty -10%
- Production resource need -10%
When complete:
- This Trait will no longer be available in other organizations.
Shown when
Czechoslovak Republic: - Original country is
Czechoslovak Republic
- Original country is
Can be taken when
Czechoslovak Republic: - Has completed focus Diversify Bat'a
- Not: Has already completed this trait in another organization
Every trait and what it gives
| Trait | On equipment | On the production line | Needs |
|---|---|---|---|
only Train | Production efficiency cap +5% | ||
| Funds Gain +20% only Train | Production efficiency gain +2% | ||
| Funds Gain +5% Requirement for Size Up -25% only Train | Production efficiency gain +3% | Joint Stock Schemes | |
| Air Attack +10% only Train | |||
only Train, Railway Artillery | Production efficiency gain +5% Production resource penalty -5% | Material Improvements or Joint Stock Schemes | |
| Reliability +2% only Support Equipment | Production output cost -3% | Improved Axle Fitting | |
only Support Equipment | Production efficiency gain +3% | Improved Wagon Design | |
only Support Equipment | Production resource need -5% Production resource penalty -1% | Improved Loading Methods | |
only Train | Production output cost -5% Production resource penalty -5% | Improved Axle Fitting | |
| Armor +10% only Train | Production resource penalty +10% | Improved Axle Fitting | |
only Railway Gun | Production output +10% | Improved Axle Fitting | |
| Reliability +10% only Railway Gun | Simplified Rail Carrier | ||
| Design Team Assign Cost -100% Design Team Change Cost -100% only Train | Production efficiency gain +5% | Armor Plating or Ugly Ducklings | |
only Train | Production resource need -25% | Quick Design Turnarounds | |
only Train | Production output +5% | Quick Design Turnarounds | |
only Train | Production efficiency cap +5% | Quick Design Turnarounds | |
| Production output cost -5% Production output +5% | Joint Stock Schemes | ||
| Production resource penalty -10% Production resource need -10% |
Policies it can take
One policy at a time, for political power. The policy list has them all.
Ruthless Contracts
Assembly Line Optimisers
Vertical Integration
Mechanical Genius
Experimental Development Teams
Permanent Industrial Revolution
Ordnance Factory Board