Military industrial organizations / Romania / MALAXA
MALAXA
Romania's military industrial organization for train, railway artillery, armor technology. Click a trait on the screen for its bonuses.

Design Team and Industrial Manufacturer for
Train
Railway Artillery
Armor technology
Research bonus: 5%
Initial Trait: Train Manufacturer
- Production efficiency cap +3%
- Research Bonus 0%
| ID | ROM_malaxa_organization_ba |
|---|---|
| Countries | |
| Traits | 26, 2 of them only for other countries |
| Tree | the game builds it on generic_train_organization |
Tank Production
Design and Production
Weapons
Material Improvements
Only for Train:
When assigned to a production line:
- Production efficiency cap +5%
Joint Stock Schemes
Only for Train:
When assigned to a production line:
- Production efficiency gain +2%
- Funds Gain +20%
Rapid Production Upscaling
Only for Train:
When assigned to a production line:
- Production efficiency gain +3%
- Funds Gain +5%
- Requirement for Size Up -25%
Needs Joint Stock Schemes
Additional Flak Wagons
Only for Train:
When assigned to an equipment variant:
- Air Attack +10%
Improved Axle Fitting
Only for Train, Railway Artillery:
When assigned to a production line:
- Production efficiency gain +5%
- Production resource penalty -5%
Needs one of Material Improvements, Joint Stock Schemes
Improved Wagon Design
Only for Support Equipment:
When assigned to an equipment variant:
- Reliability +2%
When assigned to a production line:
- Production output cost -3%
Needs Improved Axle Fitting
Shown when
Kingdom of Romania: - Original country is not
Kingdom of Romania
- Original country is not
Improved Loading Methods
Only for Support Equipment:
When assigned to a production line:
- Production efficiency gain +3%
Needs Improved Wagon Design
Shown when
Kingdom of Romania: - Original country is not
Kingdom of Romania
- Original country is not
Minimalist Wagon Design
Only for Support Equipment:
When assigned to a production line:
- Production resource need -5%
- Production resource penalty -1%
Needs Improved Loading Methods
Shown when
Kingdom of Romania: - Original country is not
Kingdom of Romania
- Original country is not
Ugly Ducklings
Only for Train:
When assigned to a production line:
- Production output cost -5%
- Production resource penalty -5%
Needs Improved Axle Fitting
Can't be taken with Armor Plating
Armor Plating
Only for Train:
When assigned to an equipment variant:
- Armor +10%
When assigned to a production line:
- Production resource penalty +10%
Needs Improved Axle Fitting
Can't be taken with Ugly Ducklings
Simplified Rail Carrier
Only for Railway Gun:
When assigned to a production line:
- Production output +10%
Needs Improved Axle Fitting
Improved Barrel Lining
Only for Railway Gun:
When assigned to an equipment variant:
- Reliability +10%
Needs Simplified Rail Carrier
Quick Design Turnarounds
Only for Train:
When assigned to a production line:
- Production efficiency gain +5%
- Design Team Assign Cost -100%
- Design Team Change Cost -100%
Needs one of Armor Plating, Ugly Ducklings
Salvage Destroyed Locomotives
Only for Train:
When assigned to a production line:
- Production resource need -25%
Needs Quick Design Turnarounds
Production at Scale
Only for Train:
When assigned to a production line:
- Production output +5%
Needs Quick Design Turnarounds
Machine Assembly
Only for Train:
When assigned to a production line:
- Production efficiency cap +5%
Needs Quick Design Turnarounds
Diversify into Tank Design
Only for Armor technology:
When assigned to an equipment variant:
- Max Speed +5%
- Reliability -5%
- Armor +5%
When assigned to a production line:
- Production efficiency gain +2%
Can be taken when
Kingdom of Romania: - Has completed focus Create Domestic Tank Designs
Off the Board Designs
Only for Armor technology:
When assigned to a production line:
- Production output +3%
- Production efficiency gain +3%
Needs Diversify into Tank Design
Armor Improvements
Only for Armor technology:
When assigned to an equipment variant:
- Defense +5%
- Armor +5%
Needs Off the Board Designs
Improved Tracks
Only for Armor technology:
When assigned to an equipment variant:
- Max Speed +5%
When assigned to a production line:
- Production output +2%
Needs Armor Improvements
Additional Anti-Aircraft Machine Guns
Only for Armor technology:
When assigned to an equipment variant:
- Defense +5%
- Air Attack +10%
Needs Off the Board Designs
Durable Engines
Only for Armor technology:
When assigned to an equipment variant:
- Breakthrough +5%
Needs Diversify into Tank Design
Can't be taken with Reliable Engines
Reliable Engines
Only for Armor technology:
When assigned to an equipment variant:
- Reliability +5%
Needs Diversify into Tank Design
Can't be taken with Durable Engines
Economical Armor Placement
Only for Armor technology:
When assigned to an equipment variant:
- Hardness -3%
- Max Speed +2%
When assigned to a production line:
- Production output +5%
Needs Armor Improvements
Adaptable Turret Ring
Only for Armor technology:
When assigned to an equipment variant:
- Soft Attack +3%
- Hard Attack +3%
Needs one of Durable Engines, Reliable Engines
Improved Ammo Stowage
Only for Armor technology:
When assigned to an equipment variant:
- Soft Attack +2%
- Hard Attack +2%
- Reliability +5%
Needs Adaptable Turret Ring
Every trait and what it gives
| Trait | On equipment | On the production line | Needs |
|---|---|---|---|
only Train | Production efficiency cap +5% | ||
| Funds Gain +20% only Train | Production efficiency gain +2% | ||
| Funds Gain +5% Requirement for Size Up -25% only Train | Production efficiency gain +3% | Joint Stock Schemes | |
| Air Attack +10% only Train | |||
only Train, Railway Artillery | Production efficiency gain +5% Production resource penalty -5% | Material Improvements or Joint Stock Schemes | |
| Reliability +2% only Support Equipment | Production output cost -3% | Improved Axle Fitting | |
only Support Equipment | Production efficiency gain +3% | Improved Wagon Design | |
only Support Equipment | Production resource need -5% Production resource penalty -1% | Improved Loading Methods | |
only Train | Production output cost -5% Production resource penalty -5% | Improved Axle Fitting | |
| Armor +10% only Train | Production resource penalty +10% | Improved Axle Fitting | |
only Railway Gun | Production output +10% | Improved Axle Fitting | |
| Reliability +10% only Railway Gun | Simplified Rail Carrier | ||
| Design Team Assign Cost -100% Design Team Change Cost -100% only Train | Production efficiency gain +5% | Armor Plating or Ugly Ducklings | |
only Train | Production resource need -25% | Quick Design Turnarounds | |
only Train | Production output +5% | Quick Design Turnarounds | |
only Train | Production efficiency cap +5% | Quick Design Turnarounds | |
| Max Speed +5% Reliability -5% Armor +5% only Armor technology | Production efficiency gain +2% | ||
only Armor technology | Production output +3% Production efficiency gain +3% | Diversify into Tank Design | |
| Defense +5% Armor +5% only Armor technology | Off the Board Designs | ||
| Max Speed +5% only Armor technology | Production output +2% | Armor Improvements | |
| Defense +5% Air Attack +10% only Armor technology | Off the Board Designs | ||
| Breakthrough +5% only Armor technology | Diversify into Tank Design | ||
| Reliability +5% only Armor technology | Diversify into Tank Design | ||
| Soft Attack +3% Hard Attack +3% only Armor technology | Durable Engines or Reliable Engines | ||
| Soft Attack +2% Hard Attack +2% Reliability +5% only Armor technology | Adaptable Turret Ring | ||
| Hardness -3% Max Speed +2% only Armor technology | Production output +5% | Armor Improvements |
Policies it can take
One policy at a time, for political power. The policy list has them all.
Ruthless Contracts
Assembly Line Optimisers
Vertical Integration
Mechanical Genius
Experimental Development Teams
Permanent Industrial Revolution
Ordnance Factory Board
Armor Welding Specialists
Casting Specialists
Heavy Gantry Cranes
Factory Applied Camouflage
Cutting Corners